TAN THANG CEMENT PLANT INVESTMENT CONSTRUCTION PROJECT

Package: General Contractor of Building, Processing, Domestic procurement and equipment installation package.

Investor:                   Tan Thang Cement Joint Stock Company

Contractor:               Lilama – Vinaconex E&C Joint Venture

Contract value:        Approx. 1.500 billion dong, including:

  • – Vinaconex E&C (construction):             over 600 billion VND
  • – Lilama (operation, equipment installation): over 800 billion VND.

Construction schedule is 17 months; running trial period is 04 months.

Tan Thang Cement Plant investment construction project with rotary kiln capacity of 5000 tons of clinker/day, equivalent to 1.960.000 tons of cement/year is located in Tan Thang commune, Quynh Luu district, Nghe An province. The project has total investment of 4.544 billion dong, including 3.150 billion of project maximum loans and the rest is self-financing. This is a priority project in Nghe An, under Vietnam cement industrial planning 2020, oriented to 2030 approved by Prime Minister under Decision No. 1488/QĐ-TTg dated August 29th, 2011.

Tan Thang cement plant uses imported production line & equipment from Europe & G7 nations. Specially, the project investor has focused on investing for automatic power system – core of 4.0 technology – in high level, in order to synchronously supervise the whole plant’s operation, to connect all environment, engineering, electronic technologies together.

Lilama – Vinaconex E&C is the General contractor of building, processing, domestic procurement & equipment installation of Tan Thang Cement Plant Project.

Vinaconex E&C shall construct items as follows: material storage silo; clinker silo; cement silo; cyclone preheater tower, packing plant, air filter house, cement mill house, material mill house.

The project expected schedule is 21 months. This is considered as an extremely challenging task for domestic construction contractor. Vinaconex E&C has gathered  all forces from human to equipment to carry out this project from June 2018, and on the way to accomplish this schedule, in order to put Tan Thang cement plant in use in soonest time.